HELP SAVE McKINNON VILLAGE

UPDATE

At the last Council Meeting (21/3/2017), Council voted to abandon the proposal to

  • rezone the site (88-100 McKinnon Road, McKinnon) to a Mixed Use Zone (Schedule 1) and
  • a Design and Development Overlay to apply a 4 storey height limit

and instead voted to

  • rezone the site to a General Residential Zone (Schedule 2), which has a mandatory 3 storey height limit and requirements for side and rear setbacks, and
  • refer the General Residential Zone (Schedule 2) and an Environmental Audit Overlay to an independent panel in accordance with Section 23 of the Planning and Environment Act 1987.

This change to the proposed zoning, while not acceding to residents request for input into determining the most appropriate zoning (General Residential – 3 stories vs Neighbourhood Residential – 2 astories), does show that Council has acknowledged the concerns expressed by residents.

GERA congratulates both the residents and Council on the decision to abandon the proposed Mixed Use zoning and 4 storey height limit.   In particular, GERA acknowledges Cr. Hyams for his comments on the assistance GERA gave to residents opposing the proposal and for acknowledging the validity of the planning arguments presented, by incorporating them in his reasoning for voting to abandon the original amendment.

 

**********************

Many readers will be aware of a development proposal within the McKinnon Village (a.ka. McKinnon Neighbourhood Centre) that involves re-zoning of a large site that is currently zoned for industrial use to a Mixed Use Zone capped at a height of 4 stories (refer to our Save McKinnon Village posting).  178 residents lodged formal objections to the proposal and 30+ of those objectors attended the recently held planning conference (refer Proposed McKinnon Mixed Use Zone – Planning Conference Report.  Overwhelmingly, the residents found that

  • Council (the Local Planning Authority) had accepted a developer’s proposal without undertaking an detailed analysis of available re-zoning, height options and site limitations* to ensure that proposed rezoning was the most appropriate for the future development of the Village.  The arguments presented to justify the selection of the MUZ and 4 storey height limit were considered weak as they were equally applicable to the selection of site’s surrounding zones (GRZ – General Residential Zone with a height limit of 3 stories or NRZ – Neighbourhood Residential Zone with a 2 storey height limit)

* Site Limitations = on the village’s boundary, surrounding zonings, local road network limitations, significant drainage issues, limited parking and lack of compatible/complementary businesses

  • the presented proposal was both inappropriate and unacceptable and that Council should  abandon/reject the current proposal pending completion of a detailed analysis and the presentation of that analysis to the community via consultation.

The Officer’s Report arising from this planning conference is included the Agenda  for this coming Tuesday’s (21/3/17) Council Meeting (insert link).  Unfortunately, as per the Save McKinnon Village website,

 “The planning officer’s report overlooked many of the objections raised including the most basic, ie.  that Council has yet to undertake an objective analysis to determine and justify the most appropriate zoning or height limit  …  the planning officer is recommending that council vote to send this amendment to an independent panel for their recommendation”

 The Save McKinnon Group and GERA believe Council, as the elected representatives of the community and the Local Planning Authority, should act in accordance with the residents clearly expressed wishes, as afterall it is frequently claimed that “it is your Planning Scheme”, by

  • abandoning/rejecting the proposed amendment
  • undertaking and presenting the analysis then,
  • if necessary, considering a third party assessment.

We accept that committing to above will add a further delay to the lengthy planning scheme amendment approval process (which, incidentally, is not subject to the 60 day time limit applicable to large planning permit applications), however, we contend that compared to lasting impact of unacceptable and inappropriate development such delay is minimal.

The Save McKinnon Village folks are appealing for your assistance in lobbing Councillor’s to vote to abandon/reject the proposal before Tuesday’s (21/3/2017) Council Meeting.  A sample email to Councillors and Councillor contact details are available on their website

 

PROPOSED McKINNON MIXED USE ZONE – PLANNING CONFERENCE REPORT

Proposal: 

Planning Scheme Amendment (C143) to re-zone a 3671sqm site currently zoned for Industrial Use  to a Mixed Use Zone – Schedule 1 and implement a Design and Development Overlay – Schedule 6 (DDO6) to apply a 4 storey height limit and rear setbacks requirements for the site.  The site is located on the south and western edge of McKinnon Village Neighbourhood Centre on the corner of Wheatley and McKinnon Roads

For those interested, background on this Amendment and proposed DDO is available in our previous posting Save McKinnon Village.

Planning Conference Details

  • Date:     23/02/2017
  • Chair:    Cr. Jamie Hyams, with Jacqui Brasher, Principal Strategic Planner, in attendance.
  • Properties Notified:   90
  • Submissions Rec’d:  182, 5 in support and 177 objecting

Officer’s Recommendation:   To be presented to Council 21/3/2017

**************

The planning conference proved to be a marathon event lasting almost 4 hours with the approx. 30 attendees raising strong objections to the proposal itself and equally strong criticisms of Council for  presenting residents with the developer’s proposed zoning, heights and setbacks,  without Council (the responsible Local Planning Authority) presenting to residents any analysis of available options.  Their overwhelming opinion was that the presented proposal was unacceptable and should be rejected by Council.  Council should consult with community to obtain their input on the most appropriate zoning, height and setbacks for the site.

Before outlining the major objections raised at the Planning Conference readers should note the following “supplementary” issues raised and discussed

  • Attendance Requirements – Council advised that the change in attendance requirements (i.e. pre-registration) and the police presence at the Conference, were precautionary measures undertaken in response to the developer (a well known local resident) receiving threatening and intimidating letters re the development proposal. Fortunately, nothing untoward occurred and many of the objectors, prefaced their opposition to the proposal, with well wishes for the developer as he embarked on his next endeavour.
  • Generally, when it comes to planning matters, there are two types of community consultations. These being amendments to the planning scheme and an application for a planning permit.
  • Amendments – basically the Planning Scheme defines what (ie. physical parameters) can be built where and the nature of the uses (ie. businesses) that are allowed in the various locations. The current proposal  fits into this category and, it is at this stage that community involvement is emphasized – it’s when the parameters are set for building heights, footprints and setbacks etc.  Although Ministerial approval is required before an amendment is effected (formal term = gazetted), Council as the Local Planning Authority is responsible for preparing and substantiating the proposed amendment – provided appropriate documentation is presented, Ministerial Approval is generally given.  VCAT has no involvement in this approval process.
  • Planning Permit Applications are the next level down from the Planning Scheme Amendments – these are applications (which include detailed building plans) to develop a site in accordance with the parameters/clauses incorporated in the Planning Scheme (ie. predefined maximum heights, building footprints and set backs etc). VCAT is the arbiter in this approval process.  With regards this current proposal, as the proposed Amendment and DDO is yet to be defined, detailed development plans are yet to be prepared.
  • Roadworks – Residents requested information on the proposed roadworks on the Cnr. Wheatley and McKinnon Roads (the tender notice appeared in the Age 21/1/2017). Since such roadworks would impact the traffic and parking conditions around the site, residents had sought (6/2/2017 & 20/2/2017), but had yet to receive information on the proposed roadworks.  The details of the roadworks provided by Cr. Hyams were that they involved raising the height of the current roundabout (to ensure motorists drove around, rather than across, the roundabout) and for associated road re-surfacing and kerb replacement.   No comment was made on the delay in passing this information on to residents.
  • Conference – As previously mentioned the Planning Conference was well conducted/facilitated. All attendees were given adequate opportunity to express their views (some more than once) on the proposal and their dissatisfaction with Council’s poor planning performance and the quality of information re the proposal that had presented to residents.

 OBJECTION ISSUES

 Mixed Use Zone (MUZ1)

  • Cr. Hyams confirmed that the proposed Mixed Use Zone, building heights and setback requirements originated with the developer, as is his right.
  • Residents argued that the creation of new Mixed Use Zone (MUZ) at this location is inappropriate due to:
    • Council’s Municipal Strategic Statement (MSS) which includes the following
      • Clause 21:07Encourage the conversion of isolated pockets of industrially zoned land to residential where residential land use surrounds such sites”
      • Clause 21:07 – Zones & Overlays: zoning non-conforming industrial uses to match the predominant surrounding zone

Due to some planning quirk the Mixed Use Zone is classified as a residential zone even though the zones higher densities, various features and allowed uses are not aligned with the sites “predominant surrounding zone” (ie. GRZ1 and NRZ1).  Attendees were extremely critical of the level of analysis undertaken in selecting the MUZ for this location and commented that all justifications presented in support the creation of a new MUZ for this location either

. equally justified rezoning to one of the alternate “predominant” surrounding zones (GRZ or NRZ) or

. were unsubstantiated (eg. increased employment opportunities) or

.  did not consider the negative amenity impacts (significant noise, traffic volumes and parking demand) the MUZ’s allowed uses (shops, food and liquor premises that favoured businesses operating with trading hours) would have on the predominant surrounding residential zones

Please note that the maximum leasable floor area for MUZ allowed uses (ie. no planning permit required) is capped at 150 sqm.  However, Council advised that area can accommodate sit in/take out stores, cafes and restaurants.  Additionally, although not specifically mentioned, planning permit applications can be lodged to expand areas beyond the 150 sqm cap.

  • Contrary to information contained in the Explanatory Note, the site is not “surrounded by residential and commercial uses” . It is a stand alone site on the boundary of McKinnon Village that is surrounded by residential zones only.
  • As previously mentioned the MUZ features lower requirements for permeability, landscaping, private open space and setback requirements than those of surrounding GRZ and NRZ zones.  Setback requirements and landscaping being “hot” issues as the location is prone to storm water flooding and providing the transition  from growth areas to the NRZ areas.
  • Located away from the Village core, the site lacks
    • Facilities (eg. parking, train station) and complementary businesses
    • The Commercial Zones “buffering” impact on noise levels impacting residential areas
    • Is not readily accessible to the majority of the centres residents
  • McKinnon Village currently has many vacant shops. The recently completed grade separation works had added more vacant shops and more will be added as already approved multi-unit developments are completed.  McKinnon doesn’t need additional shops, particularly shops located away from the village core.

Design and Development Overlay – DDO6

  • As the Mixed Use Zone has no height limits or set back requirements DDO6 defines a 4 storey (13.5-14.5m depending on land slope) height limit and rear setbacks for the site.
  • Height limits

The proposed height limit of 4 storey/14.5m

    •  is contrary to the designation of McKinnon Village as a Neighbourhood Centre and the 2013 Zone Implementation that implemented a 10.5m/3 storey height limit on residential zones within this neighbourhood centre and other such centres
    • Is inconsistent with the concept of scaling down building heights from the Village centre towards the Neighbourhood Residential Zone.
    • The site is subject to a special building overlay (SBO).  An SBO is related to requirements for storm water flooding treatments, it is not and should not be a justification for a height increase of an additional storey.
    • Like wise, describing a proposed building as a “Gateway” is not a justification for increased height that is inconsistent with the surrounding zones.
      • A “Gateway” is not specifically related to height, its a description that can also be applied to a building with architectural merit that fits within or enhances the character of the surrounding area
      • A Gateway building is more appropriately located on the Jasper Road (a main road) entrance to the village rather than that village’s boundary with the NRZ.
    • Will result in visual bulk, dominance and overshadowing. With regards visual bulk, residents highlighted the dominance of the only 4 storey building within Village (diagonally opposite the new train station) .  The dominance of this building when viewed from across the road or when approaching along McKinnon Road  indicates how dominant a 4 storey building, surrounded by 3 and 2 storey buildings, will be.
  • Inadequate Setback Provisions

The absence of above and below ground street-front, side and rear setbacks

    • restricts ground absorption of storm water runoff (a Special Building Overlay applies to the site).  Surrounding topography and  inadequate Council maintenance of drains within the Village frequently resulted in storm water flooding of the immediate and surrounding areas.
    • restricts on-site landscaping opportunities (eg mature vegetation) that would mitigate visual bulk and provide a positive amenity  impact for future residents.
  • In response to questioning on above ground side and street front setbacks the Developer’s Representative indicated that diagrams of proposed setbacks had been forwarded to Council. The diagrams, distributed to objectors the next day, are flagged as being indicative only – this combined with the absence of such setback requirements in DDO6 raises serious questions re the inclusion of side and street-front setbacks if the current proposal is accepted by Council.
  • Additionally, the Developer’s Representative was unable advise if side and street-front setbacks would be included at ground level or commence at a higher level.

 Traffic and Parking

 In addition to criticisms of Council’s failure to address the cumulative traffic and parking issues arising from increased development within McKinnon Village and flow on impacts arising from the Villages close proximity to the Ormond and Bentleigh centres, the following issues were raised

  • Already congested McKinnon Road is becoming even more congested (despite removal of the level crossing). The intersection with Wheatley Road (the only local road that links North and Centre Roads) is becoming increasingly dangerous.  The proposal would increase traffic volumes on both roads.
  • Wheatley Road services schools and significant redevelopments within the Ormond, McKinnong and Bentleigh centres.  The road is narrow and experiences high parking demand that requires regular “crossover pullovers” by current traffic.
  • On Street parking (on both McKinnon and Wheatley Roads) within the vicinity of the proposal is minimal (due to the roundabout slipways, bus stops and crossovers) and is simply incapable of providing for the extra demand that will generated by a Mixed Use Zone.
  • Proposed development vehicle access via a one-car width laneway accessed from Wheatley Road is inadequate.

Precedence

Following on from the above questioning of the proposed new MUZ and DDO height limit and setbacks, the issue of precedence was raised.   The approval of this proposal would set a significant and far reaching precedence for the whole of Glen Eira.  This precedent would be far more significant than the current of precedence used  justify incremental building heights (ie from 8 stories to 10 stories) within the various centres.  This precedent would justify

  • the creation of new MUZ higher density zones
    • on the edges of any neighbourhood centre rather than in the centres core and
    • in locations not accessed by main or arterial roads
  • negate the concept of scaling down building heights from the village core to NRZ

This precedent doesn’t currently exist,  don’t let it be created.

*************

Apologies for the length of this posting folks – it’s a challenge to summarize 4 hours – thanks for hanging in there.

As always, if you would like to make any comments or seek some clarification of issues raised, feel free to access GERA’s Facebook page

 

SAVE McKINNON VILLAGE – PLANNING SCHEME AMENDMENT C143

GERA has recently been asked by some McKinnon Residents to assist them in reviewing a proposed Planning Scheme Amendment (C143) and Design and Development Overlay – Schedule 6 (DDO6) for a large development site located on the south and western edge of McKinnon Village Neighbourhood Centre.  While the residents accept that their Village area will change, they do not believe that the currently proposed Mix Use Zoning is appropriate for the stand alone site.

The residents are seeking community support in objecting to the proposed Amendment and DDO. – the objection due date is 23/12/2016Check out their website – Save McKinnon Village.

The residents are requesting that, in the New Year and after January’s Planning Conference, Council re-assesses the Development Proposal with a view to abandoning Amendment C143 and DDO6 and enabling resident input into decisions related to

  • Appropriate Re-zoning
  • Appropriate height and setback (below and above ground) provisions

SITE DETAILS

  • 88-100 McKinnon Road, McKinnon. Located on the corner of Wheatley and McKinnon Roads.
  • Area = 3671 sqm
  • 430 metres to the McKinnon train station
  • A Special Building Overlay (ie. area prone storm water run-off and flooding) is applicable to site.
  • Current site zoning is Industrial (INZ3), which prohibits residential development.
  • Adjoining Zones are GRZ3 (General Residential Zone –  10.5m, 3 stories) & NRZ1 (Neighbourhood Residential – 8m, 2 stories)
  • A narrow right of way (laneway) exists at the rear of the site.

McKinnon Village Current Planning Zones & Heightsvillage-zones-v4b

PROPOSED CHANGES – Planning Scheme Amendment C143 and Design Development Overlay Schedule 6

  • Proposed Mixed Use Zone (MUZ) which allows commercial, retail, industrial and residential usage as a right (ie. no planning permit required, therefore, no third party objection rights). “Allowed as a right usages” include businesses with extended trading hours (eg.  Convenience Mini-Marts and Takeouts, Food and Drink services).
  • A maximum building height of (14.5 metres – 4 stories)
  • Setbacks
    • Rear Set back only – 4 metres from property boundary, applicable set backs increase as building height increases
    • No side or street front setbacks at ground level or as building height increases.

 RESIDENTS GROUNDS FOR OBJECTION

  • MUZ is not an appropriate zoning for a village or neighbourhood centre due to the adverse amenity impacts generated by
    • Noise arising from the allowed uses and extended trading hours
    • increased traffic volumes
    • increased parking demand
  • In addition to the above adverse amenity impacts, the site’s location within the McKinnon Village makes the proposed MUZ zoning inappropriate, as it is located
    • on edge of the designated neighbourhood centre rather than in the village centre. It is a stand- alone location separated from the village hub by residential zones
    • well away from the Village’s Commercial Zones and their
      • facilities (eg. parking, train station)
      • complementary businesses
      • “buffering” effect on noise impacting the residential zones
    • surrounded by residential zones (GRZ and NRZ) with limited on street parking surrounding the site due to road configuration.
    • is not readily accessible to the majority of village residents
  • The proposed height limit of 14.5m/4 stories is
    • contrary to the designation of McKinnon Village as a Neighbourhood Centre and the 2013 Zone Implementation that implemented a 10.5m/3storey height limit on residential zones within Neighbourhood Centres
    • inconsistent with the concept of scaling down building heights from the Village centre towards the Neighbourhood Residential Zone. In this case, from the Village’s Commercial Zone  (no height limit) there is a height limit of 3 stories which then rises to 4 stories on the southern and western boundary of the Neighbourhood Residential Zone
  • The absence of above and below ground street front and side setbacks
    • restricts ground absorption of storm water runoff (a Special Building Overlay applies to the site)
    • restricts landscaping opportunities
    • will result in visual bulk and dominance and overshadowing
  • There are no Neighbourhood Character requirements specified in the Amendment or DDO or Glen Eira’s Housing Diversity Policy. There should be as McKinnon Village has a distinct and unique character.

 ******************

Council has advised that a Planning Conference will be scheduled in the New Year and that Council will decide on the proposed Amendment and DDO  at it’s February Council Meeting.  In the intervening period the objection due date is 23/12/2016  and there’s the busy Christmas/New Year holiday period to consider – timing doesn’t favour the residents.

GERA encourages our members and readers to submit an objection to the proposal – numbers count!!!.    A sample objection letter is available on the   Save McKinnon Village website.